Locally Integrated

Our Engineering Advantage

WA Proven

Deploying a multi-megawatt microgrid in remote Western Australia is an incredibly complex logistical and electrical challenge. To eliminate integration risk, Minsaram Energy proudly partners with Magellan Power—WA’s premier power electronics manufacturer—as our dedicated engineering and integration facility. By fully assembling, containerising, and testing your microgrid right here in Perth, we guarantee that when your system arrives on site, it is flawless, compliant, and ready to power your operations.

 

Engineered in Perth for the Outback

Our power architecture combines global Tier-1 hardware—solid-state batteries and advanced inverters—with elite, localised mechanical engineering.

 

Inside our partner’s Perth-based manufacturing facility, our microgrids are custom-built into heavy-duty, mine-spec modular containers. Our local engineering teams heavily ruggedize every system specifically for the WA landscape. This includes advanced thermal management integration, cyclonic structural reinforcing, and specialized ingress protection to seal the highly sensitive power electronics against pervasive, iron-rich Pindan dust.

 

image_edited.jpg

Flawless Compliance: WAER & DEMIRS

The Western Australian electrical grid operates under some of the most stringent regulatory frameworks in the world. Equipment that passes European or East Coast Australian standards will frequently fail a Western Australian site safety audit.

Because our microgrids are integrated locally by leading WA electrical engineers, every inch of copper, every switchboard, and every safety relay is explicitly designed to meet the strict Western Australian Electrical Requirements (WAER) and the rigorous safety standards enforced by the Department of Energy, Mines, Industry Regulation and Safety (DEMIRS). You are inheriting an asset built to local code, by local experts.

 

Rigorous Factory Acceptance Testing (FAT)

Discovering a software communication error between an inverter and a battery management system is a minor fix in a Perth warehouse; discovering it 1,500 kilometers away on a live mine site is a million-dollar emergency.

Before any Minsaram Energy container is loaded onto a northbound truck, it undergoes exhaustive Factory Acceptance Testing (FAT). Our local integrators simulate your exact site load profile, force the microgrid through extreme fault scenarios, and verify the precise millisecond response of the "spinning reserve." We ensure the hardware and software handshake perfectly in a controlled environment, completely de-risking your project timeline.

 

Magellan Power supplies energy storage for Onslow Power project

"Plug-and-Play" Site Deployment

By doing the heavy electrical lifting in Perth, we drastically reduce the construction footprint on your mine site. Our containerized microgrids are designed for rapid, "plug-and-play" deployment. When the modules arrive at your operation, they are simply dropped onto their footings, physically bolted together, and connected to your Point of Common Coupling (PCC).

This localized integration strategy slashes the requirement for expensive, high-risk live electrical work in remote locations, ensuring your transition to clean energy is fast, safe, and entirely invisible to your critical daily operations.

MINSARAM
ENERGY

To be the definitive energy partner for Western Australia's remote industries, permanently decoupling the resource sector from diesel reliance through resilient, high-performance microgrids.

Contact Us

E : info@minsaram.com.au

P : 08 9445 7124

HQ

1/7 Hector Street

Osborne Park

6017 WA

bottom of page